What exit is 575 in Georgia?

What exit is 575 in Georgia?

Interstate 75 south at Exit 271 for Chastain Road east to I-575 north.

What exit is Woodstock GA?

Exit 7
Exit 7 – GA-92; Woodstock – Interstate I-575 Northbound in Georgia – iExit.

Where does 575 start and end?

I-575 begins in northern Cobb County near Kennesaw and goes mostly through Cherokee County, ending at its northern border with Pickens County, where it continues as SR 515. It is also the Phillip M. Landrum Memorial Highway in honor of Phillip M.

When was I-575 built?

October 16, 1980
Interstate 575/Constructed

IS 575 in Atlanta a toll road?

Two optional, reversible toll lanes will be built along I-75 from I-285 to I-575. One will continue up I-75 to Hickory Grove Road and one will run along I-575 up to Sixes Road. The toll lanes will operate southbound in the morning and northbound the rest of the day.

What exit is Atlanta on I-75?

It is also designated—but not signed—as State Route 401 (SR 401). I-75 is the only interstate to traverse the full length of the state from north to south. In downtown Atlanta, I-75 joins with I-85 as the Downtown Connector….Exit list.

County Tift
Location Tifton
mi 64.06
km 103.09
Destinations I-75 BL / US 41 – Tifton

What exit is Holly Springs?

Exit 14
Exit 14 – Holly Springs; Canton – Interstate I-575 Northbound in Georgia – iExit.

Can anyone use the express lane in Georgia?

OPEN TO ALL – Georgia Express Lane open to all vehicles with less than 6 wheels at no charge, including those without a Peach Pass. Sign displayed to safely divert traffic around a blockage in one or more of the general-purpose lanes.

Where is the exit for I-575 in Atlanta?

Opening of the new exit coincided with development of the adjacent Outlet Shoppes at Atlanta on the east side of the freeway. 3 SR 372/5 Business tie into the north end of I-575 via an expressway spur northwest from old SR 5 (Ball Ground Highway / Canton Highway).

When was the first stage of I-575 built?

The first stage of I-575 was constructed in 1979 from I-75 to SR 92 near Woodstock and was opened to traffic on October 16, 1980. The next section to Georgia 20 began construction in 1981, and was opened on March 29, 1985 as far north as exit 11 (now mile 20).

Where does I-575 begin in Cherokee County?

I-575 is also the unsigned State Route 417 and is cosigned as SR 5. I-575 begins in northern Cobb County near Kennesaw and goes mostly through Cherokee County, ending at its northern border with Pickens County, where it continues as SR 515 .

Where are the express lanes on Interstate 575?

The Northwest Corridor project underway between November 2013 and September 8, 2018 constructed 29.7 miles of two reversible toll lanes along both I-75 and I-575 north of the Perimeter Highway (I-285). The express lanes extend north along I-575 to the interchange (Exit 11) with Sixes Road.