How long is Lalbaug flyover?

How long is Lalbaug flyover?

The 2.5-km flyover between the ITC hotel in Parel and Jijamata Udyan in Byculla was inaugurated in June 2011 to ease congestion on Dr Babasaheb Ambedkar Road.

Which is the longest flyover in Mumbai?

The 9.29km stretch from Orange Gate to Mahul creek is the longest flyover in Mumbai and third longest in India.

Which city has the longest flyover in India?

Hyderabad
Hyderabad: Hyderabad can now boast of the longest flyover in the country. An elevated expressway that has drastically cut travel time to the city’s international airport was opened to the public on Tuesday.

When was JJ flyover built?

Built at a cost of Rs72 crore, the flyover was opened for traffic in 2001 and it is used by at least 60,000 motorists every day. “For the past almost nine years, the flyover has given matchless service.

Which is the largest flyover in the world?

Top 10: World’s longest bridges

  1. The Danyang-Kunshan Grand Bridge, China. 164km.
  2. Changhua–Kaohsiung Viaduct, Taiwan. 157km.
  3. Cangde Grand Bridge, China. 116km.
  4. Tianjin Grand Bridge, China. 113km.
  5. Weinan Weihe Grand Bridge, China. 79km.
  6. Bang Na Expressway, Thailand. 54km.
  7. Beijing Grand Bridge, China.
  8. Lake Pontchartrain Causeway, USA.

Which city has largest flyover?

‘Garden city of India’ Bangalore has one of the greatest flyovers in India. The electronic city flyover is the biggest all over India. The flyover spans a length of 5.23 kilometres, designed to decongest traffic at the junction of NH-7 and outer ring road built by Gammon India.

What is the name of JJ flyover?

Qutb E Konkan Makhdoom Ali Mahimi flyover
JJ flyover has an official name, and it’s not JJ But the 2.4km overpass is officially the Qutb E Konkan Makhdoom Ali Mahimi flyover. It’s named for a 13th century Sufi saint who lived in Mahim and was the India’s first commentator of the Quran.

Who constructed JJ flyover?

according to n k bhatia, the general manager of project contractor gammon india, the completion of the flyover in two years span has been a challenge. “most of the site work, like the erection of the superstructure, was carried out in the night hours,” he said.